HXSS-15
HXSS
HXSS-15
| Availability: | |
|---|---|
| Quantity: | |
Our high-strength steel skyscrapers are engineered to redefine vertical construction, with a core advantage of supporting 50+ floors while cutting structural weight by 30% compared to traditional concrete buildings. Backed by the pioneering rectangular CFST structure technology developed via industry-university-research cooperation with top universities, this product breaks international technical monopolies and is listed in China Torch Program. It combines unmatched strength, seismic resilience, and eco-friendliness, ideal for building landmark super skyscrapers that meet global standards like ASCE 7-22 and LEED certification.

Specification Item | Details |
Model | HXSS-15 |
Brand | HXSS |
Core Material | Q355B steel (yield strength ≥355 MPa), S460M fire-resistant steel beams |
Seismic Rating | 9-degree seismic performance |
Maximum Clear Span | 18m column-free space |
Recycled Steel Content | ≥90% |
Prefabrication Completion Rate | 95% factory-finished components |
Tolerance Precision | ±2mm via automated CNC cutting |
Adopting high-grade steel materials, our skyscrapers achieve 30%-40% lighter frameworks than concrete structures. Advanced BIM modeling optimizes load distribution, saving 15%-20% of raw materials. A 45-story mixed-use tower in Shanghai reduced foundation costs by 25% and accelerated construction speed by 35%, proving the economic efficiency of high-strength steel applications.
95% factory-prefabricated components minimize on-site work. A 30-story building can cut 6–8 months off the construction period, with CNC cutting ensuring ±2mm precision to eliminate rework. A Dubai hotel project completed 80% of floors in 12 months, beating conventional schedules by 40%.
Equipped with Buckling-Restrained Braces (BRBs) and moment-resisting frames, the structure delivers 9-degree seismic resistance, absorbing 60% more energy than concrete. Real-time sensor networks monitor stress distribution, and post-earthquake retrofit costs are 70% lower than traditional systems.
With over 90% recycled steel content, embodied carbon is reduced by 45% vs concrete. Integrated photovoltaic-ready roofs and thermal-break cladding cut HVAC loads by 25%. A LEED Platinum office tower in NYC achieved 35% energy savings, driven by steel’s inherent thermal efficiency.
18m clear spans eliminate interior columns, boosting rentable space by 12%-18%. Adjustable steel grids support over 10 layout reconfigurations, enhancing long-term usability for skyscraper owners.
Enabling vertical city integration, these skyscrapers host 18m column-free retail atriums and 30% faster core construction. A 60-story Dubai tower completed 1.5 floors weekly, integrating offices, luxury apartments, and sky gardens, with developers seeing 15% higher ROI than concrete alternatives.
BRB-equipped steel frames ensure 9-degree seismic safety, with ±5mm vibration control for MRI equipment. A Tokyo medical center achieved 48-hour post-earthquake operational readiness, while antimicrobial steel walls cut infection risks by 35%.
Reconfigurable MEP grids support weekly tech upgrades. A Silicon Valley HQ shifted 40% server capacity to edge computing in 3 months, with 14m clear spans enabling AI-driven hot-desking and 30% higher occupancy efficiency.
95% factory-finished guest pods accelerate project delivery. A London hotel opened 8 months early, saving £12M in financing costs, with acoustic-decoupled floors reducing noise by 55dB and ventilation cavities cutting airborne pathogens by 60%.
We conduct strict self-inspection at every stage of design and fabrication, and welcome third-party inspection for quality verification. Our professional technical engineers provide on-site installation supervision overseas, with successful projects in Iraq, Dubai, South Africa, Algeria, and Ghana.
We are a factory, so you can get the best and most competitive price.
We inspect every step during design and fabrication, and third-party inspection is also acceptable.
Yes, our professional technical engineers can supervise on-site installation overseas, with proven experience in multiple countries.
Our main markets cover Europe, Africa, the Middle East, Southeast Asia, Australia, New Zealand, South America, etc.
Are you ready to build a high-efficiency, eco-friendly super skyscraper that stands out in the urban skyline? Inquire now to get a customized quote, or add to basket to start your project journey with our reliable high-strength steel solutions.
Our high-strength steel skyscrapers are engineered to redefine vertical construction, with a core advantage of supporting 50+ floors while cutting structural weight by 30% compared to traditional concrete buildings. Backed by the pioneering rectangular CFST structure technology developed via industry-university-research cooperation with top universities, this product breaks international technical monopolies and is listed in China Torch Program. It combines unmatched strength, seismic resilience, and eco-friendliness, ideal for building landmark super skyscrapers that meet global standards like ASCE 7-22 and LEED certification.

Specification Item | Details |
Model | HXSS-15 |
Brand | HXSS |
Core Material | Q355B steel (yield strength ≥355 MPa), S460M fire-resistant steel beams |
Seismic Rating | 9-degree seismic performance |
Maximum Clear Span | 18m column-free space |
Recycled Steel Content | ≥90% |
Prefabrication Completion Rate | 95% factory-finished components |
Tolerance Precision | ±2mm via automated CNC cutting |
Adopting high-grade steel materials, our skyscrapers achieve 30%-40% lighter frameworks than concrete structures. Advanced BIM modeling optimizes load distribution, saving 15%-20% of raw materials. A 45-story mixed-use tower in Shanghai reduced foundation costs by 25% and accelerated construction speed by 35%, proving the economic efficiency of high-strength steel applications.
95% factory-prefabricated components minimize on-site work. A 30-story building can cut 6–8 months off the construction period, with CNC cutting ensuring ±2mm precision to eliminate rework. A Dubai hotel project completed 80% of floors in 12 months, beating conventional schedules by 40%.
Equipped with Buckling-Restrained Braces (BRBs) and moment-resisting frames, the structure delivers 9-degree seismic resistance, absorbing 60% more energy than concrete. Real-time sensor networks monitor stress distribution, and post-earthquake retrofit costs are 70% lower than traditional systems.
With over 90% recycled steel content, embodied carbon is reduced by 45% vs concrete. Integrated photovoltaic-ready roofs and thermal-break cladding cut HVAC loads by 25%. A LEED Platinum office tower in NYC achieved 35% energy savings, driven by steel’s inherent thermal efficiency.
18m clear spans eliminate interior columns, boosting rentable space by 12%-18%. Adjustable steel grids support over 10 layout reconfigurations, enhancing long-term usability for skyscraper owners.
Enabling vertical city integration, these skyscrapers host 18m column-free retail atriums and 30% faster core construction. A 60-story Dubai tower completed 1.5 floors weekly, integrating offices, luxury apartments, and sky gardens, with developers seeing 15% higher ROI than concrete alternatives.
BRB-equipped steel frames ensure 9-degree seismic safety, with ±5mm vibration control for MRI equipment. A Tokyo medical center achieved 48-hour post-earthquake operational readiness, while antimicrobial steel walls cut infection risks by 35%.
Reconfigurable MEP grids support weekly tech upgrades. A Silicon Valley HQ shifted 40% server capacity to edge computing in 3 months, with 14m clear spans enabling AI-driven hot-desking and 30% higher occupancy efficiency.
95% factory-finished guest pods accelerate project delivery. A London hotel opened 8 months early, saving £12M in financing costs, with acoustic-decoupled floors reducing noise by 55dB and ventilation cavities cutting airborne pathogens by 60%.
We conduct strict self-inspection at every stage of design and fabrication, and welcome third-party inspection for quality verification. Our professional technical engineers provide on-site installation supervision overseas, with successful projects in Iraq, Dubai, South Africa, Algeria, and Ghana.
We are a factory, so you can get the best and most competitive price.
We inspect every step during design and fabrication, and third-party inspection is also acceptable.
Yes, our professional technical engineers can supervise on-site installation overseas, with proven experience in multiple countries.
Our main markets cover Europe, Africa, the Middle East, Southeast Asia, Australia, New Zealand, South America, etc.
Are you ready to build a high-efficiency, eco-friendly super skyscraper that stands out in the urban skyline? Inquire now to get a customized quote, or add to basket to start your project journey with our reliable high-strength steel solutions.
